Electrified Jeep Wagoneer, expected by the end of 2025.

Posted on September 12, 2024
General
Electrified Jeep Wagoneer, expected by the end of 2025.

Sterantis on Wednesday announced a series of production updates at its three Michigan plants, which will include an electrified Jeep Wagoneer by the end of 2025.

The automaker announced that it will invest about $97.6 million to prepare its Warren Truck Assembly Plant for the electrified Wagoneer. The plant also produces gasoline-powered Wagoneers, and the two will share a production line.

Sterantis described the electrified Wagoneer as one of “four Jeep EVs” planned worldwide by the end of 2025, but the vehicle is not a pure battery-electric vehicle, but a series that will share technology with the 2025 Ram 1500 Ramcharger It is believed to be a plug-in hybrid.

The 1500 Ramcharger is based on Sterantis' STLA frame platform designed for hybrid and electric vehicles with body-on-frame construction, and the electrified Wagoner would be similar.

Powertrains are also likely to be common to both vehicles: the 1500 Ramcharger combines a 92 kwh battery with a 3.6-liter V-6 engine that functions purely as a generator. Ram claims the truck's electric drive system has a peak output of 663 hp and a range of 145 miles with the battery alone and 690 miles with the battery and gas engine combined. Similar numbers are expected for the electrified Wagoner.

News of the electrified Wagoner was first mentioned in a UAW document released in November 2023. The document also indicated that an electric Wagoneer would be launched in 2027 and that gasoline-powered Wagoneers would be refreshed in 2025 and 2027. Given the timing, these refreshes will likely coincide with the arrival of electrified and electric Wagoneers.

Other announcements by Sterantis on Wednesday include confirmation that the 1500 Ramcharger and 2025 Ram 1500 REV electric trucks will be produced at the Sterling Heights plant where the gas 1500 is built.

Sterantis also announced that the Dundee engine plant will be used to manufacture components for the STLA frame and STLA large platform, in addition to new four-cylinder engines, including a 1.6-liter turbo four that will be used in the 2025 hybrid powertrain to be used for the new STLA platform.

You may also like

Maserati GranTurismo to cease production until February 3.
Maserati GranTurismo to cease production until February 3.

Sterantis has temporarily halted production at its sprawling Mirafiori plant in Turin, Italy. [Its vehicles include the Fiat 500e electric hatchback a...

Dec 26

Genesis Goes from Scale Model to Le Mans in 18 Months
Genesis Goes from Scale Model to Le Mans in 18 Months

In December, Genesis launched its own motorsports division, Genesis Magma Racing (GMR), and confirmed plans to enter its newly developed LMDh racing c...

Dec 27

Why the Nissan GT-R is called Godzilla
Why the Nissan GT-R is called Godzilla

The Nissan GT-R's “Godzilla” nickname, which has been embraced by car enthusiasts in the United States, has its origins in Australia. As Nissan's ...

Dec 25


Trending

Maserati GranTurismo to cease production until February 3.
Maserati GranTurismo to cease production until February 3.

Sterantis has temporarily halted production at its sprawling Mirafiori plant in Turin, Italy. [Its vehicles include the Fiat 500e electric hatchback a...

Dec 26

Nissan Exterra may be revived to compete with Toyota 4Runner
Nissan Exterra may be revived to compete with Toyota 4Runner

The Nissan Xterra trademark has been renewed, hinting at a possible revival of the rugged SUV.On December 23, 2024, Nissan filed an application in the...

Jan 03

First Retailer of the 2025 Chevrolet Corvette ZR1 to Auction
First Retailer of the 2025 Chevrolet Corvette ZR1 to Auction

With the arrival of the 2025 Chevrolet Corvette ZR1 and its screaming twin-turbo V-8 engine with 1,064 hp, the American sports car is about to reach h...

Dec 23